供应【铝合金方板、铝合金条板、铝合金垂片吊顶】
放线顶棚内各类X管线已安装、吊顶吊杆安装、风机盘管安装、新风支管安装、双温水管安装、冷凝水管安装、风管保温、双温水管打压保温、防火卷帘门安装、防火卷帘、风机盘管、电管安装及穿线、照明电管安装及穿线、消防自动报警系统、广播系统、弱电电管安装及穿线、安装并监控、弱电电缆敷设、消火栓箱安装、吊顶龙骨安装并调平、照明灯具吊杆安装、各种风口安装、喷洒支管接到位、灯具安装、吊顶面板安装、烟感、喷洒头、探头安装、成品保护。
Put the line ceiling all sorts of pipes installed, ceiling fan coil rod installation, installation, air pipe installation and two tdivperature water pipes installed, condensate pipe installation, wind pipe insulation, pipe insulation, double tdivperature divssure fire shutter door installation, fire shutter, fan coil tube, threading, installation and installation of lighting tube and wear line, automatic fire alarm systdiv, broadcasting systdiv, weak tube installation and threading, installation and monitoring, weak cabling, fire hydrant box installation, ceiling keel installation and adjustment, lighting installation, installation, air boom spraying, lighting installation, pipe to ceiling panel installation, smoke detectors, sprinkler head probe, installation, product protection.
2、铝合金方板施工技术准备
(1)铝合金方板测量放线:依据统一测定的轴线控制线和建筑标高50线,引测并弹于地面上顶棚纵横分格控制线。由于本工程空间较大,而且面层使用材料种类较多,所以大厅中的金属吊顶起拱问题具体部位具体分析确定。而附属房间的吊顶起拱,起拱高度不得大于房间短向跨度的1/300。另外该吊顶工程机电X管道多,吊顶与机电各X交叉作业多,所以为了更好的控制各机电X管道高度,减少施工返工量,吊顶放线时采用双线控制。条线是顶棚面层标高线,X二条线是机电设备与管线安装***低控制线,即顶棚完成面标高上量≥200mm并弹线于墙上。
(2)铝合金方板深化设计:依据建筑设计天花平面图和统一细部节点:顶棚与墙、柱收边,防火卷帘处收口;灯带与顶棚收口;排版设计应考虑对称,各种风口、烟感、喷洒头、灯具、广播等机电设备的位置应在板中央等原则。
3、铝合金方板施工工艺流程:
弹线(标高、吊杆位置)→安装吊杆、调节已有→安装边龙骨→安装主龙骨→安装次龙骨→安装喷头、灯具、面-调整板缝、平整度→验收
4、铝合金方板施工方法
(1)铝合金方板顶棚:
1)放线:根据室内标高线和吊顶主控制线(指吊顶天花深化设计排板平面布置图标明的排板控制线)。在墙面及柱子上弹好吊顶标高线(指双层控制线):边龙骨线(吊顶标高线);顶棚内各种管道***低标高控制线;不同标高的分界位置线,在顶板上弹出龙骨布置线。
2)吊杆安装:吊杆主要采用?10,并刷二遍防锈漆。考虑到在顶板焊接吊杆施工比较困难,可以用膨胀螺栓固定,用?10膨胀螺栓固定吊杆,但要注意钻孔前探明钢筋的位置。由于部分走道内通风管道较大及其它管线的影响,无法在楼板下固定吊杆,因此需采取用L50×5角钢固定在两侧墙体(墙体局部填充混凝土)的方式吊挂龙骨及灯具。
订购电话;132-4289-9083